Construction Equipment



Dump Truck – Construction Equipment

Dump trucks or production trucks are those that are used for transporting loose material such as sand, dirt, and gravel for construction. The typical dump truck is equipped with a hydraulically operated open box bed hinged at the rear, with the front being able to be lifted up to allow the contents to fall out on the ground at the site of delivery.Dump trucks come in many different configurations with each one specified to accomplish a specific task in the construction chain.
dump_trucks_construction_engineering
Standard dump truck
The standard dump truck is a full truck chassis with the dump body mounted onto the frame. The dump body is raised by a hydraulic ram lift that is mounted forward of the front bulkhead, normally between the truck cab and the dump body. The standard dump truck also has one front axle, and one or more rear axles which normally has dual wheels on each side. The common configurations for standard dump trucks include the six wheeler and ten wheeler.
Transfer dump truck
For the amount of noise made when transferring, the transfer dump truck is easy to recognize. It’s a standard dump truck that pulls a separate trailer which can be loaded with sand, asphalt, gravel, dirt, etc. The B box or aggregate container on the trailer is
powered by an electric motor and rides on wheels and rolls off of the trailer and into the main dump box. The biggest advantage with this configuration is to maximize payload capacity without having to sacrifice the maneuverability of the short and nimble dump truck standards.
Semi trailer end dump truck
The semi end dump truck is a tractor trailer combination where the trailer itself contains the hydraulic hoist. The average semi end dump truck has a 3 axle tractor that pulls a 2 axle semi trailer. The advantage to having a semi end dump truck is rapid unloading.
Semi trailer bottom dump truck
A bottom dump truck is a 3 axle tractor that pulls a 2 axle trailer with a clam shell type dump gate in the belly of the trailer. The biggest advantage of a semi bottom dump truck is the ability to lay material in a wind row. This type of truck is also maneuverable in reverse as well, unlike the double and triple trailer configurations.
Double and triple trailer
The double and triple bottom dump trucks consist of a 2 axle tractor pulling a semi axle semi trailer and an additional trailer. These types of dump trucks allow the driver to lay material in wind rows without having to leave the cab or stop the truck. The biggest disadvantage is the difficulty in going in reverse.
Side dump trucks
Side dump trucks consist of a 3 axle trailer pulling a 2 axle semi trailer. It offers hydraulic rams that tilt the dump body onto the side, which spills the material to the left or right side of the trailer. The biggest advantages with these types of dump trucks are that they allow rapid unloading and carry more weight than other dump trucks.
In addition to this, side dump trucks are almost impossible to tip over while dumping, unlike the semi end dump trucks which are very prone to being upset or tipped over. The length of these trucks impede maneuverability and limit versatility.
Off road dump trucks
Off road trucks resemble heavy construction equipment more than they do highway dump trucks. They are used strictly for off road mining and heavy dirt hauling jobs, such as excavation work. They are very big in size, and perfect for those time when you need to dig out roads and need something to haul the massive amounts of dirt to another location.
This article was submitted by Er. Ankush

Front Loader – Construction Equipment

Also known as a front end loader, bucket loader, scoop loader, or shovel, the front loader is a type of tractor that is normally wheeled and uses a wide square tilting bucket on the end of movable arms to lift and move material around.The loader assembly may be a removable attachment or permanently mounted on the vehicle. Often times, the bucket can be replaced with other devices or tools, such as forks or a hydraulically operated bucket.
Larger style front loaders, such as the Caterpillar 950G or the Volvo L120E, normally have only a front bucket and are known as front loaders, where the small front loaders are often times equipped with a small backhoe as well and called backhoe loaders or loader backhoes.Loaders are primarily used for loading materials into trucks, laying pipe, clearing rubble, and also digging. Loaders aren’t the most efficient machines for digging, as they can’t dig very deep below the level of their wheels, like the backhoe can.
Front_loader_construction_equipment
The deep bucket on the front loader can normally store around 3 – 6 cubic meters of dirt, as the bucket capacity of the loader is much bigger than the bucket capacity of a backhoe loader. Loaders aren’t classified as excavating machinery, as their primary purpose is other than moving dirt.In construction areas, mainly when fixing roads in the middle of the city, front loaders are used to transport building materials such as pipe, bricks, metal bars, and digging tools. Front loaders are also very useful for snow removal as well, as you can use their bucket or as a snow plow. They can clear snow from the streets and highways, even parking lots.They will sometimes load the snow into dump trucks which will then haul it away.
Unlike the bulldozer, most loaders are wheeled and not tracked. The wheels will provide better mobility and speed and won’t damage paved roads near as much as tracks, although this will come at the cost of reduced traction. Unlike backhoes or tractors fitted with a steel bucket, large loaders don’t use automotive steering mechanisms, as they instead steer by a hydraulically actuated pivot point set exactly between the front and rear axles.This is known as articulated steering and will allow the front axle to be solid, therefore allowing it to carry a heavier weight.
Articulated steering will also give a reduced turn in radius for a given wheelbase. With the
front wheels and attachment rotating on the same axis, the operator is able to steer his load in an arc after positioning the machine, which can come in quite handy. The problem is that when the machine is twisted to one side and a heavy load is lifted high in the air, it has a bigger risk of turning over.
This article was submitted by Er. Ankush

Forklift

Sometimes called a forklift truck, the forklift is a powerful industrial truck that is used to lift and transport material by steel forks that are inserted under the load. Forklifts are commonly used to move loads and equipment that is stored on pallets. The forklift was developed in 1920, and has since become a valuable piece of equipment in many manufacturing and warehousing operations.
Types of Forklifts
The most common type of design with forklifts is the counter balance. Other types of designs include the reach truck and side loader, both of which are used in environments where the space is at a minimum.
Forklift_construction_equipment
Control and capability
Forklifts are available in many types and different load capacities. In the average warehouse setting,most forklifts have load capacities of around five tons. Along with the control to raise and lower the forks, you can also tilt the mast to compensate for the tendency of the load to angle the blades towards the ground and risk slipping it off the forks. The tilt will also provide a limited ability to operate on ground that isn’t level.There are some variations that allow you to move the forks and backrest laterally, which allows easier placement of a load. In addition to this, there are some machines that offer hydraulic control to move the forks together or further apart, which removes the need for you to get out of the cab to manually adjust for a different size load.
Another forklift variation that is sometimes used in manufacturing facilities, will utilize forklifts with a clamp attachment that you can open and close around a load, instead of having to use forks. Products such as boxes, cartons, etc., can be moved with the clamp attachment.Go to www.warmmilkybiscuit.com
Safety
Forklifts are rated for loads at a specified maximum weight and a specified forward type center of gravity. All of this information is located on a nameplate that is provided by the manufacturer and the loads cannot exceed these specifications. One of the most important aspects of operating a forklift is the rear wheel steering. Even though this helps to increase maneuverability in tight cornering situations, it differs from the traditional experience of a driver with other wheeled vehicles as there is no caster action. Another critical aspect of the forklift is the instability. Both the forklift and the load must be considered a unit, with a varying center of gravity with every movement of the load.You must never negotiate a turn with a forklift at full speed with a raised load, as this can easily tip the forklift over.
This article was submitted by – Er.  Ankush

Various Types Of Cranes

A crane is a tower or derrick that is equipped with cables and pulleys that are used to lift and lower material. They are commonly used in the construction industry and in the manufacturing of heavy equipment. Cranes for construction are normally temporary
structures, either fixed to the ground or mounted on a purpose built vehicle.
They can either be controlled from an operator in a cab that travels along with the crane, by a push button pendant control station, or by radio type controls. The crane operator is ultimately responsible for the safety of the crews and the crane.
Mobile Cranes
The most basic type of crane consists of a steel truss or telescopic boom mounted on a mobile platform, which could be a rail, wheeled, or even on a cat truck. The boom is hinged at the bottom and can be either raised or lowered by cables or hydraulic cylinders.
Mobile_Cranes
Telescopic Crane
This type of crane offers a boom that consists of a number of tubes fitted one inside of the other. A hydraulic mechanism extends or retracts the tubes to increase or decrease the length of the boom.
Telescopic_Mobile_Crane
Tower Crane
The tower crane is a modern form of a balance crane. When fixed to the ground, tower cranes will often give the best combination of height and lifting capacity and are also used when constructing tall buildings.
Tower_crane_picture
Truck Mounted Crane
Cranes mounted on a rubber tire truck will provide great mobility. Outriggers that extend vertically or horizontally are used to level and stabilize the crane during hoisting.
Truck_Mounted_Crane_Knuckle_Boom_picture
Rough Terrain Crane
A crane that is mounted on an undercarriage with four rubber tires, designed for operations off road. The outriggers extend vertically and horizontally to level and stabilize the crane when hoisting. These types of cranes are single engine machines where the same engine is used for powering the undercarriage as it is for powering the crane. In these types of cranes, the engine is normally mounted in the undercarriage rather than
in the upper portion.
Rough_terrain_crane_picture
Loader Crane
A loader crane is a hydraulically powered articulated arm fitted to a trailer, used to load equipment onto a trailer. The numerous sections can be folded into a small space when the crane isn’t in use.
Loader_Crane_picture
Overhead Crane
Also refered to as a suspended crane, this type is normally used in a factory, with some of them being able to lift very heavy loads. The hoist is set on a trolley which will move in one direction along one or two beams, which move at angles to that direction along elevated or ground level tracks, often mounted along the side of an assembly area.
Overhead_Crane_picture
In the excavation world, cranes are used to move equipment or machinery. Cranes can quickly and easily move machinery into trenches or down steep hills, or even pipe. There are many types of cranes available, serving everything from excavation to road work.
Cranes are also beneficial to building bridges or construction. For many years, cranes have proven to be an asset to the industry of construction and excavating. Crane operators make really good money, no matter what type of crane they are operating.
This article was submitted by Er. Vikrant

Compact Excavator

The compact hydraulic excavator can be a tracked or wheeled vehicle with an approximate operating weight of 13,300 pounds.Normally, it includes a standard backfill blade and features an independent boom swing. The compact hydraulic excavator is also known as a mini excavator.
A compact hydraulic excavator is different from other types of heavy machinery in the sense that all movement and functions of the machine are accomplished through the transfer of hydraulic fluid.The work group and blade are activated by hydraulic fluid acting upon hydraulic cylinders.The rotation and travel functions are also activated by hydraulic fluid powering hydraulic motors.
Most types of compact hydraulic excavators have three assemblies – house, undercarriage, and the work group.
Compact_Excavator_image
House
The house structure contains the compartment for the operator, engine compartment, hydraulic pump and also the distribution components. The house structure is attached to the top of the undercarriage via swing bearing. Along with the work group, them house is able to rotate upon the undercarriage without limit due to a hydraulic distribution valve that supplies oil to the undercarriage components.
Undercarriage
The undercarriage of compact excavators consists of rubber or steel tracks, drive sprockets, rollers,idlers, and associated components and structures.The undercarriage is also home to the house structure and the work group.
Work group
The work group consists of the boom, dipper or arm, and attachment. It is connected to the front of the house structure via a swinging frame that allows the work group to be hydraulically pivoted left or right in order to achieve offset digging for trenching parallel with the tracks.
Independent boom swing
The purpose of the boom swing is for offset digging around obstacles or along foundations,
walls, and forms. Another use is for cycling in areas that are too narrow for cab rotation. Another major advantage of the compact excavator is the independent boom swing.
Backfill blade
The backfill blade on compact excavators are used for grading, leveling, backfilling, trenching, and general dozer work. The blade can also be used to increase the dumping height and digging depth depending on it’s position in relation to the workgroup.

Bulldozer – Construction Equipment

The bulldozer is a very powerful crawler that is equipped with a blade. The term bulldozer is often used to mean any type of heavy machinery, although the term actually refers to a tractor that is fitted with a dozer blade. Often times, bulldozers are large and extremely powerful tracked vehicles. The tracks give them amazing ground mobility and hold through very rough terrain. Wide tracks on the other hand, help to distribute the weight of the dozer over large areas, therefore preventing it from sinking into sandy or muddy ground.
Bulldozers have great ground hold and a torque divider that’s designed to convert the power of the engine into dragging ability, which allows it to use its own weight to push heavy objects and even remove things from the ground. Take the Caterpillar D9 for example, it can easily tow tanks that weight more than 70 tons. Due to these attributes,bulldozers are used to clear obstacles, shrubbery and remains of structures and buildings.
The blade on a bulldozer is the heavy piece of metal plate that is installed on the front. The
blade pushes things around. Normally, the blade comes in 3 varieties:
1. A straight blade that is short and has no lateral curve, no side wings, and can be used
only for fine grading.
2. A universal blade, or U blade, which is tall and very curved, and features large side wings to carry more material around.
3. A combination blade that is shorter,offers less curvature, and smaller side wings.
bulldozer

Modifications

Over time, bulldozers have been modified to evolve into new machines that are capable of things the original bulldozers weren’t. A good example is that loader tractors were created by removing the blade and substituting a large volume bucket and hydraulic arms which will raise and lower the bucket, therefore making it useful for scooping up the earth and loading it into trucks.Other modifications to the original bulldozer include making it smaller to where it can operate in small working areas where movement is very limited, such as mining caves and tunnels. Very small bulldozers are known as calfdozers.
History

The first types of bulldozers were adapted from farm tractors that were used to plough fields. In order to dig canals, raise earth dams, and partake in earthmoving jobs, the tractors were equipped with a thick metal plate in the front. Later on, this thick metal plate earned the name blade.
The blade of the bulldozer peels layers of soil and pushes it forward as the tractor advances.The blade is the heart and soul of the bulldozer, as it was the first accessory to make full use for excavation type jobs. As the years went by, when engineers needed equipment to complete larger jobs, companies such as CAT, Komatsu, John Deere, Case, and JCB started to manufacture large tracked earthmoving equipment.They were very loud, very large, and very powerful and therefore earned the nickname “bulldozer”.Over the years, the bulldozers got bigger, more powerful, and even more sophisticated. The important improvements include better engines,more reliable drive trains, better tracks, and even hydraulic arms that will enable more precise manipulation of the blade and automated controls.As an added option, bulldozers can come equipped with a rear ripping claw to break up pavement or loosen rocky soil.The best known manufacturer of bulldozer is CAT,which has earned a vast reputation for making
tough and durable, yet reliable machines.Even though the bulldozer started off a modified farmtractor, it rapidly became one of the most useful pieces of equipment with excavating and construction.
Submitted By : Er. Vikrant

Backhoe Loader – Construction Equipment

Also referred to as a loader backhoe, the backhoe loader is an engineering and excavation vehicle that consists of a tractor, front shovel and bucket and a small backhoe in the rear end. Due to the small size and versatility, backhoe loaders are common with small construction projects and excavation type work.Originally invented in Burlington Iowa back in 1857, the backhoe loader is the most common variation of the classic farm tractor.As the name implies, it has a loader assembly on the front and a backhoe attachment on the back.
Anytime the loader and backhoe are attached it is never referred to as a tractor, as it is not normally used for towing and doesn’t normally have a PTO.When the backhoe is permanently attached, the machine will normally have a seat that can swivel to the rear to face the backhoe controls.Any type of removable backhoe attachments will normally have a seperate seat on the attachment itself.Backhoe loaders are common and can be used for many tasks, which include construction, light transportation of materials, powering building equipment, digging holes and excavating, breaking asphalt, and even paving roads.You can often replace the backhoe bucket with other tools such as a breaker for breaking and smashing concrete and rock. There are some loader buckets that offer a retractable bottom, which enable it to empty the load more quickly and efficiently.
Backhoe-Loader

Construction Equipments -1

Construction Equipments -11

Construction Equipments -11

Construction Equipments -10

Construction Equipments -10

Construction Equipments -9

Construction Equipments -9

Construction Equipments -8

Construction Equipments -8

Construction Equipments -7

Construction Equipments -21

Construction Equipments -21

Construction Equipments -20

Construction Equipments -20

Construction Equipments -19

Construction Equipments -19

Construction Equipments -18

Construction Equipments -18

Construction Equipments -17

Construction Equipments -16

Construction Equipments -16

Construction Equipments -15

Construction Equipments -15

Construction Equipments -14

Construction Equipments -14

Construction Equipments -13

Construction Equipments -13

Construction Equipments -12

Construction Equipments -21

Construction Equipments -21

Construction Equipments -20

Construction Equipments -20

Construction Equipments -19

Construction Equipments -19

Construction Equipments -18

Construction Equipments -18

Construction Equipments -17

Construction Equipments -26

Construction Equipments -26

Construction Equipments -25

Construction Equipments -25

Construction Equipments -24

Construction Equipments -24

Construction Equipments -23

Construction Equipments -22

Construction Equipments -31

Construction Equipments -31

Construction Equipments -30

Construction Equipments -30

Construction Equipments -29

Construction Equipments -29

Construction Equipments -28

Construction Equipments -28

Construction Equipments -27

Construction Equipments -27
Filed under Gallery-Constructi
Filed under Gallery-Constructio
Filed under Gallery-Co

Wednesday 14 September 2011

Prestress Engineering

  • Economics of R.C.C. Water tank Resting over Firm Ground vis-a-vis Pre-stressed Concrete Water Tank Resting over Firm Ground

  • By
    MS. SNEHAL R. METKAR
    (P.G. STUDENT)
    DEPARTMENT OF CIVIL ENGINEERING
    (STRUCTURAL ENGINEERING IIND YEAR)
    P.R.M.T OF TECH. & RESEARCH, BADNERA-AMRAVATI
    SANT. GADGE BABA (AMARAVATI) UNIVERSITY (MAHARASHTRA)
    COUNTRY INDIA – 444701
  • GUIDED BY
    Prof A. R. Mundhada
    (PROFESSOR)
    DEPARTMENT OF CIVIL ENGINEERING,
    P.R M.I.T.R., BADNERA, AMRAVATI.
    MAHARASHTRA, INDIA-4444701,
  • Abstract
    Water tanks are used to store water and are designed as crack free structures, to eliminate any leakage. In this paper design of two types of circular water tank resting on ground is presented. Both reinforced concrete (RC) and prestressed concrete (PSC) alternatives are considered in the design and are compared considering the total cost of the tank. These water tank are subjected to the same type of capacity and dimensions. As an objective function with the properties of tank that are tank capacity, width &length etc.
  • A computer program has been developed for solving numerical examples using the Indian std. Indian Standard Code 456-2000, IS-3370-I,II,III,IV & IS 1343-1980. The paper gives idea for safe design with minimum cost of the tank and give the designer the relationship curve between design variable thus design of tank can be more economical ,reliable and simple. The paper helps in understanding the design philosophy for the safe and economical design of water tank.
  • Keywords
    Rigid based water tank, RCC water tank, Prestressed Concrete, design, details, minimum total cost, tank capacity
    Continue Reading »

  • What is stress corrosion of prestressing steel?

  • Stress corrosion is the crystalline cracking of metals under tensile stresses in the presence of corrosive agents. The conditions for stress corrosion to occur are that the steel is subjected to tensile stresses arising from external loading or internally induced stress (e.g. prestressing). Moreover, the presence of corrosive agents is essential to trigger stress corrosion. One of the main features of stress corrosion is that the material fractures without any damage observed from the outside. Hence, stress corrosion occurs without any obvious warning signs.
  • This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

  • In prestressing work, if more than one wire or strand is included in the same duct, why should all wires/strands be stressed at the same time?

  • If wires/strands are stressed individually inside the same duct, then those
    stressed strand/wires will bear against those unstressed ones and trap them. Therefore, the friction of the trapped wires is high and is undesirable.
  • This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

  • What are the functions of grout inside tendon ducts?

  • Grout in prestressing works serves the following purposes:
  • (i) Protect the tendon against corrosion.
    (ii) Improve the ultimate capacity of tendon.
    (iii) Provide a bond between the structural member and the tendon.
    (iv) In case of failure, the anchorage is not subject to all strain energy.
  • This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

  • Why is spalling reinforcement needed for prestressing works in anchor blocks?

  • Reinforcement of anchor blocks in prestressing works generally consists of bursting reinforcement, equilibrium reinforcement and spalling reinforcement. Bursting reinforcement is used where tensile stresses are induced during prestressing operation and the maximum bursting stress occurs where the stress trajectories are concave towards the line of action of the load. Reinforcement is needed to resist these lateral tensile forces. For equilibrium reinforcement, it is required where there are several anchorages in which prestressing loads are applied sequentially.
  • During prestressing, spalling stresses are generated in the region behind the loaded faces of anchor blocks. At the zone between two anchorages, there is a volume of concrete surrounded by compressive stress trajectories. Forces are induced in the opposite direction to the applied forces and it forces the concrete out of the anchor block. On the other hand, the spalling stresses are set up owing to the strain compatibility relating to the effect of Poisson’s ratio.

  • What are the three major types of reinforcement used in prestressing?

  • (i) Spalling reinforcement
    Spalling stresses are established behind the loaded area of anchor blocks and this causes breaking away of surface concrete. These stresses are induced by strain incompatibility with Poisson’s effects or by the shape of stress trajectories.
  • (ii) Equilibrium reinforcement
    Equilibrium reinforcement is required where there are several anchorages in which prestressing loads are applied sequentially.
  • (iii) Bursting Reinforcement
    Tensile stresses are induced during prestressing operation and the maximum bursting stress occurs where the stress trajectories are concave towards the line of action of the load. Reinforcement is needed to resist these lateral tensile forces.
  • This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

  • Under what situation shall engineers use jacking at one end only and from both ends in prestressing work?

  • During prestressing operation at one end, frictional losses will occur and the prestressing force decreases along the length of tendon until reaching the other end. These frictional losses include the friction induced due to a change of curvature of tendon duct and also the wobble effect due to deviation of duct alignment from the centerline. Therefore, the prestress force in the mid-span or at the other end will be greatly reduced in case the frictional loss is high. Consequently, prestressing, from both ends for a single span i.e. prestressing one-half of total tendons at one end and the remaining half at the other end is carried out to enable a even distribution and to provide symmetry of prestress force along the structure.
  • In fact, stressing at one end only has the potential advantage of lower cost when compared with stressing from both ends. For multiple spans (e.g. two spans) with unequal span length, jacking is usually carried out at the end of the longer span so as to provide a higher prestress force at the location of maximum positive moment. On the contrary, jacking from the end of the shorter span would be conducted if the negative moment at the intermediate support controls the prestress force. However, if the total span length is sufficiently long, jacking from both ends should be considered.
  • This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

  • What are parasitic forces for prestressing?

  • In statically determinate structures, prestressing forces would cause the concrete structures to bend upwards. Hence, precambering is normally carried out to counteract such effect and make it more pleasant in appearance. However, for statically indeterminate structures the deformation of concrete members are restrained by the supports and consequently parasitic forces are developed by the prestressing force in addition to the bending moment generated by eccentricity of prestressing tendons. The developed forces at the support modify the reactions of concrete members subjected to external loads and produces secondary moments (or parasitic moments) in the structure.
  • This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

  • What are the main potential benefits in using the bridge form of precast prestressed beams supporting in-situ concrete top slab?

  • The potential benefits of using the bridge form of precast prestressed beams supporting in-situ concrete top slab are:
  • (i) For bridges built on top of rivers and carriageway, this bridge form provides the working platform by the precast beams so that erection of falsework is not required.
  • (ii) This bridge form generally does not require any transverse beams or diaphragms (except at the location of bridge supports), leading to reduction of construction time and cost.
  • (iii) It creates the potential for simultaneous construction with several spans.
  • This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

  • For incremental launching method, the span depth ratio of bridges is normally low. Why?

  • Bridges constructed by incremental launching method are usually low in span depth ratio and typical values are 14 to17. With low span depth ratio, the bridge segments are stiff in bending and torsion which is essential to cater for the launching process. Such low span depth ratio could tolerate the discrepancy in vertical alignment on supports over which they slide. Such differential settlements may occur owing to the shortening of piers when the superstructure slides over them and the differential deformation of different piers.

  • What is the optimum size of cable duct for prestressing?

  • The cross sectional area of duct is normally 2.5 times that of the area of prestressing steel. The size of ducts should be not designed to be too small because of the followings:
  • (i) Potential blockage by grout
    (ii) Excessive development of friction
    (iii) Difficulty in threading prestressing tendon
  • This question is taken from book named – A Closer Look at Prevailing Civil Engineering Practice – What, Why and How by Vincent T. H. CHU.

  • Why type of prestressing is better, external prestressing or internal prestressing?

  • At several locations in the span (i.e. third or quarter points) the tendons are deviated to the correct tendon profile by concrete deviators in external prestressing. The advantages of external prestressing are listed below:
  • (i) Owing the absence of bond between the tendon and structure, external prestressing allows the removal and replacement of one or two tendon at one time so that the bridge could be retrofitted in the event of deterioration and their capacity could be increased easily. This is essential for bridges in urban areas where traffic disruption is undesirable.
  • (ii) It usually allows easy access to anchorages and provides the ease of inspection.
  • (iii) It allows the adjustment and control of tendon forces.
  • (iv) It permits the designer more freedom in selecting the shape of cross section of bridges.
  • (v) Webs could be made thinner so that there is a reduction of dead load.
  • (vi) It enhances a reduction of friction loss because the unintentional angular change like wobble is eliminated. Moreover, the use of polyethylene sheathing with external prestressing has lower friction coefficient than corrugated metal ducts in internal prestressing.
  • (vii) Improvement of concrete placing in bridge webs owing to the absence of ducts.
  • The major distinction between internal prestressing and external prestressing lies in the variation in cable eccentricity. The deflected shape of external tendons is not exactly the same as beams because the
    displacement of external tendons is controlled by deviators. This is a second order effect at working load and it is very important at ultimate load.
  • Based on past research, for small span with shallow cross section (i.e. less than 3m deep), the use of internal prestressing requires less steel reinforcement. However, for deeper bridge cross section, the employment
    of external prestressing results in smaller amount of steel reinforcement.
  • This question is taken from book named – A Closer Look at Prevailing Civil Engineering Practice – What, Why and How by Vincent T. H. CHU.

  • Central prestressing is normally required during construction in Incremental Launching method. Why?

  • The erection condition plays an important role to the structural design of bridges when incremental launching method is adopted.
  • Each section of superstructure is manufactured directly against the
    preceding one and after concrete hardens, the whole structure is moved forward by the length of one section. When the superstructure is launched at prefabrication area behind one of the abutments, it is continually subjected to alternating bending moments. Each section of superstructure (about 15m to 25m long) is pushed from a region of positive moment and then to a region of negative moment and this loading cycled is repeated. As such, tensile stresses occur alternately at the bottom and top portion of superstructure section. For steel, it is of equal strength in both compression and tension and it has no difficulty in handling such alternating stress during launching process. However concrete could only resist small tensile stresses and therefore, central prestressing is carried out to reduce the tensile stress to acceptable levels.
  • Central prestressing means that the prestressing cables are arranged such that the resultant compressive stresses at all points in a given cross section are equal and it does not matter whether tensile stresses occur in upper or lower portion of superstructure during launching process.
    bridge works
  • This question is taken from book named – A Closer Look at Prevailing Civil Engineering Practice – What, Why and How by Vincent T. H. CHU.

  • GENERAL
    The purpose of grouting is to provide permanent protection to the post-tensioned steel against corrosion and to develop bond between the Prestressing cables and the surrounding structural concrete.Grouting shall be carried out as early as possible, but generally not later than two weeks of stressing.Whenever this stipulation cannot be completed with for unavoidable reasons adequate temporary protection of the cables against corrosion by methods or products, which will not impair the ultimate adherence of the injected grout shall be ensured till grouting.
  • Material
    1. Water : Only Clean potable water free from impurities shall be used.
    2. Cement : Ordinary port land cement 43Grade shall be used. It should be as fresh as possible and free from any lumps.
    3. Admixture : Non-shrink powder compound. (Intra Plast N-200 of Sika Brand).
  • Equipments
    1. Grout Mixer Mechanical type
    2. Grout Pump J-600
    3. Grout Screen
    4. Connection and air vents
    5. Generator
    6. Thermometer, Stopwatch etc.
  • Procedure of the Grout
    1)After measuring the slip of 24hrs, the extended cables shall be cut off
    50mm away from bearing plates.
    2) Cement mortar of 1:1 ratio is applied over the Bearing Plates on both ends of girders to prevent the leakage of Grout. Grouting operation shall be commenced after two days of sealing the ends.
    3) Water cement ratio should be as low as possible consistent with workability. This ratio is 0.42 (not more than 0.45 as per MOST,P-677) proportions of material shall be based on field trials made on the Grout before commencement of grouting. As per specifications, the temperature of the Grout maintained at 250C by adding ice into water if necessary.
    4) Water shall be poured in to the mixer with Port land cement and admixture is added into it. Mixing shall be continued for duration to obtain uniform and thoroughly blended Grout. Grout shall be continuously agitated and then pour into another tank after passing through the screen.
    5) Ducts shall be flushed with water for cleaning as well as for wetting the surface of the duct walls.
    6) The water in the duct shall be blown out with compress air.
  • Injection Of Grout:-
  • 1) After mixing of Grout, all connections from tank to pump and pump to inlet shall be checked.
    2) The grout shall be allowed to flow freely from the other end until the consistency of the grout at this end is the same as that of the Grout at the injection end.
    3) When the Grout flows at the other end, it shall be closed off and grouting is continued so that pressure commenced, full injection pressure at about 5 kg/cm2 shall be maintained for at least one minute before closing the injection pipes.
    4) If there is leakage observed at any of ends the grouting operation shall be discontinued and the entire duct flushed with high-pressure water. Grout not used within 30minutes of mixing shall be rejected.
    6) Check the Compressive strength of the cubes for the grout in 10 cm cubes for 7 days, which should not be less than 17 Mpa.
    7) Grouting record for each cable shall be maintained as per Performa in MOST.
  • This information was submitted by Er. Neha Sood on 3d June 2008

Pile Engineering



In deep excavation, adjacent ground water table is drawn down which may affect the settlement of nearby buildings. What is the remedial proposal to rectify the situation?

One of the methods to control settlement of nearby buildings due to excavation work is by recharging. Water collected in wells in deep excavation is put back to the top of excavation in order to raise the drawn-down water table. The location of recharge should be properly selected to ensure the soil is sufficiently permeable to transfer the pumped water back near the affected buildings.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the problems associated with prestressed concrete piles (Daido)?

The origin of Daido piles comes from Japan where these prestressed concrete piles are used as replacement plies. Holes are pre-formed in the ground and Daido piles are placed inside these pre-formed holes with subsequent grouting of void space between the piles and adjacent ground. However, in Hong Kong Daido piles are constructed by driving into ground by hammers instead of the originally designed replacement method. Since the installation method of Daido piles is changed, construction problems like deformation of pile tip shoes, crushing of concrete at pile tip etc. occur. Reference is made to B. W. Choy (1993).
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Should compaction be carried out to freshly-placed concrete piles?

In normal practice, reliance is placed on the self-compaction of specially designed concrete mixes to achieve adequate compaction. The use of vibrating devices like poker vibrators is seldom adopted for the compaction
of concrete piles. In fact, other than the consideration of the impracticality in using vibrating device in long piles, there is serious concern about the possible occurrence of aggregate interlock which poses difficulty during casing extraction. In the worst scenarios, the temporary casings together with reinforcement cages are extracted during the lifting up of pile casings. This is another reason which accounts for not using vibrating machines for piles with casing extraction.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Is the quality of concrete impaired by free-falling concrete placement method in bored piles?

Based on the research by STS Consultants Ltd., it was found that concrete placed by free falling below 120 feet would not suffer from the problem of segregation and the strength of concrete would not be detrimentally impaired provided that the piles’ bore and base are dry and free of debris. Moreover, it is presumed in the past that during free falling of fresh concrete into the pile bores the hitting of falling concrete in the reinforcement cage causes segregation. However, in accordance with the experimental results of STS Consultants Ltd., the striking of reinforcement cage by fresh concrete does not have significant effect on the strength of concrete
In addition, for long bored piles, it is impractical to conduct vibration to concrete. For concrete placed by free falling method, the impact action arising from free falling is assumed to induce adequate vibration. On the other hand, concrete placed by tremie method appears to be lack of vibration and this may affect the strength and integrity of concrete. The research results showed that the strength of vibrated concrete was slightly higher than unvibrated concrete. Vibration proved to have added advantage to concrete strength but not essential to achieve the design pile strength.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Is pile tip cover necessary for rock-socketed H-piles?

In current practice concrete cover is usually provided at the pile tips of pre-bored H-piles socketed in rock. The purpose of such arrangement is to avoid the potential occurrence of corrosion to H-piles in case concrete cover is not designed at pile tips. However, recent field and laboratory observations had reservation of this viewpoint. In case H-piles are designed to be placed directly on top of rock surface, it provides the tip
resistance to limit the pile movement in the event of bond rupture between grout and H-piles. As such, some contractors may choose to tamp the H-piles by using drop hammers to ensure the H-piles are founded directly on top of rock surface. Practically speaking, it poses difficulties during the process of tamping because there is a chance of possible buckling of long H-piles when too much energy is provided to the piles.

Why is sleeving applied in piles constructed on slopes?

For high-rise buildings constructed on steep cut slopes, these buildings are usually supported by large diameter piles. Though the piles are founded at some depth below the slopes, lateral load arising from wind on buildings may induce loads on the slop and causes slope failures. For shallow depths of slope which is marginally stable, it is more vulnerable to slope failure.
Hence, an annulus of compressible material called sleeving is introduced in piles so as to reduce the transfer of lateral loads from buildings to slopes.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What is the purpose of shaft grouting of deep foundations?

In shaft grouting operation, tube-a-manchette pipes are fixed at regular spacing to the reinforcement cage. After concreting barrettes/bored piles, a small volume of water is injected under high pressure into these pipes to crack the concrete. The cracking process should be carried out within 24 hours after concreting. The purpose of cracking is to create a path for grout to go through. About a week after concreting of barrette, grouting is then carried out in these pipes to improve the friction between the foundation and the surrounding soils.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Can down the hole hammer function below water table?

Down the hole hammer has been used extensively to form pre-bored holes as rock sockets for mini piles and pre-bored H piles. The hammer functions by driving repeatedly a drill bit using compressed air on the rock. However, the use of down the hole hammer is normally limited to hole diameter of 600mm.
In using down the hole hammer, compressed air serves to drive the drill bit and to expel the cuttings which are blown out to the air at ground level. However, for driving the hammer about 30m below ground water level, the air pressure has difficulty in coping with great water pressure. Moreover, blowing of cuttings by compressed air also dewaters the nearby soils. As a result, settlement of nearby ground may occur which is undesirable.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Why can’t normal Reversed Circulation Drills function in shallow rock conditions?

Reversed Circulation Drill (RCD) is normally used for forming large diameter rock socket. The method involves the exertion of a download force of roller cutter bits on rock, together with the action of rotation and
grinding of bits on rock. The cuttings are then removed by reverse circulation. The water and cuttings are airlifted through a central drill pipe, which is also used for rotating the drill bits.
To facilitate the grinding action on the rock, about 15 tons of force is used for each cutter. With such a high bit force, the drill frame has to be stationed by attaching to pile casing of bored piles. Therefore, during the
drilling operation, the pile casing is prevented from lifting up by the weight of drill rig and pile casing and the frictional forces developed between the ground and pile casing. Hence, in shallow rock conditions with short length of pile casings, it may affect the stability of RCD drill rig.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Should bentonite be added to improve the stability of grout?

For unstable grout, particles will come out of the grout suspension leading to incomplete grouting and clogging of pipes. The stability of grout can be improved by adding additives such as bentonite. However, bentonite
should not be used with very fine cements because its grain size is bigger than that of fine cements. Tests conducted previously confirm that a grout with bentonite is less stable under pressure.
It is commonly accepted that a fissure may be penetrated by grout with the grain size about 3-5 times smaller than the aperture of fissure. Hence, OPC cement may penetrate fissures of aperture greater than 0.4mm while microfine cement and ultrafine cement may penetrate fissures of aperture greater than 0.1mm and 0.03mm respectively.

What are the reasons in observed settlements in rockfill foundation?

Compression of rockfill is normally caused by a reduction in dimension of fill and by rearrangement of particles into closer packing.
When the rockfill are saturated, the strength of rock would be reduced accordingly. In fact, wetting of rock surfaces does not reduce the coefficient of sliding friction between rockfills. Considerable settlement may result not from the lubricating effect of water but from a reduction of rock strength at its point of contact. The contact points would then be crushed under intergranular force and the contact area increases until contact pressure is less than the strength of rockfill.
Rockfill with sharp corners proved to be more liable to settlement than those of well-rounded.
To minimize settlement of rockfill, the intergranular force should be reduced and this is achieved by grading the size of rock particles such that there is minimum amount of voids and hence a maximum amount of particle contacts. To avoid particle rearrangement under future loading, the rockfill should be properly compacted with earth-moving machinery.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

In seismic liquefaction, what is the difference of pile failures mechanism between lateral spreading and buckling?

Most of design codes assume that pile fails during strong earthquake by lateral spreading. Lateral spreading is based on bending mechanism where the inertia and slope movement causes bending in piles. In essence, piles are considered as beams which are subjected to lateral loads such as slope movement leading to pile failure.
Piles are slender columns with lateral support from foundation soils. When the length of pile increases, the buckling loads decrease with the square of pile length. For buckling failure, soils around the piles lose the confining stress during earthquake and can hardly provide lateral support to piles. As such, the pile serves as an unsupported column with axial instability. It will buckle sideways in the direction of least bending stiffness under axial load.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

When are prestressed tiebacks used in sheet piling works?

The use of prestressed tiebacks gets rid of the need of interior bracing. Prestressed tiebacks are anchored into rock or granular soils and excavation can be conducted by using powerful shovel instead of using hand excavation or other small excavators. It provides less restraint and allows free movement for excavation.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What is the significance of quality of bentonite slurry in the construction of diaphragm walls?

The quality of slurry plays an important role in the quality of diaphragm walls. Firstly, if a thick slurry cake is formed in the interface between slurry and in-situ soil, it has a tendency to fall off during concreting works and it mixes with freshly placed concrete. Moreover, large thickness of slurry cake would reduce the concrete cover and affect the future durability performance of diaphragm walls.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

During concreting of diaphragm walls, three tremie pipes are used in one time. However, only one concrete truck is available. How should the concreting works be carried out?

The most ideal situation is to supply each tremie pipe with a single concrete truck. However, if only one concrete truck is available, all the fresh concrete in the truck should not be placed in one single tremie pipe.
With all fresh concrete placed in one single tremie pipe while the others left void, then due to the huge supply of concrete to the tremie pipe, a small concrete hump may form at the base of the tremie pipe and it is likely that it may collapse and trap the slurry inside the diaphragm walls. Therefore, the fresh concrete should be evenly shared among the tremie pipes to avoid such occurrence.

What is the difference between compaction grouting and fracture grouting?

Grouting can be implemented in two common modes, namely compaction grouting and fracture grouting. For compaction grouting, high viscosity grout is commonly used for injection into soils. Upon reaching the soils, the grout would not penetrate into soil spaces. Instead it forms a spherical bulb and remains as a homogeneous mass. The formation of bulb displaces the nearby soils.
Fracture grouting involves the use of low viscosity grout. Upon injection, the grout would split open the ground by hydraulic fracturing and penetrate into the fractures. Similarly, soils are displaced during the process.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Is critical depth of piles a fallacy?

The critical depth of piles are normally assumed as 10-20 pile diameter deep and is the depth beyond which the resistance is constant and is equal to respective value at critical depth.
The critical depth is a fallacy which comes from the failure to interpret the results of full and model-scale pile tests. In full-scale test, the neglect of presence of residual loads renders a measured load distribution to be
linear below the so called “critical depth”. Residual loads refer to loads that are induced in piles during and after installation of piles.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

How do fixed and pinned connections between piles and pile caps affect the load carrying capacity of piles?

The type of connection between piles and pile caps affects the load carrying capacity of pile groups. The fixity of pile head into pile cap, instead of pinning into pile cap, enhances higher lateral stiffness of the pile groups. For instance, for the same deflections, a cap with fixed connected piles can sustain far more loads than that of pinned connected piles. To satisfy the criterion of fixed connection, the minimum embedded length of piles into pile caps should be at least two times the diameter of piles.
Moreover, the fixed connection of piles at pile caps allows significant bending moment to be transmitted through the connections when compared with pinned connections.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the methods to tackle negative skin friction?

(i) Use slender pile sections (e.g. H-pile or precast pile) because smaller pile area when subject to the same working load would produce higher deformation, thus increasing the relative downward movement of piles.
(ii) In a certain region of H-piles for ground water table fluctuation, painting is applied on the surface of H-piles because the rise and fall of water table contribute to the corrosion of H-piles. On the other hand,
to reduce the effect of additional loads brought about by negative skin friction, bitumen is applied on the pile surface corresponding to the region of soils that has negative skin friction. However, bitumen should not be applied to the whole section of H-piles because it would be unable to derive the designed frictional reaction from soils.
(iii) Design the piles as end-bearing so that they can take up more load.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the advantages of using top-down approach in basement construction?

The advantages of top-down approach are listed below:
(i) The structures above ground can be carried out simultaneously with the structures below ground. This greatly reduces the time for construction.
(ii) By using this approach, settlement can be reduced.
(iii) Since the permanent columns and slabs can be utilized to support loadings during construction, it saves the cost of formwork.
Note: Top-down approach means construction of basement is carried out from ground level downwards

How to measure rock during piling operation?

There is no strict rule in governing the measure of rock encountered in piling operation. There are two common practices in measuring rock during piling:
(i) Measure the quantity of obstruction taken out from the drilled out;
(ii) Firstly, it is assumed that the rock surface is uniform. Based on this assumption, measure the obstruction level by using a tape.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

It is not necessary to design nominal reinforcement to piles. Is it true?

In BS8110 and BS5400 Pt.4, they require the provision of nominal reinforcement for columns. However, for pile design the requirement of nominal reinforcement may not be necessary. Firstly, as piles are located
underground, the occurrence of unexpected loads to piles is seldom. Secondly, shear failure of piles is considered not critical to the structure due to severe collision. Moreover, the failure of piles by buckling due to fire is unlikely because fire is rarely ignited underground.
However, the suggestion of provision of nominal reinforcement to cater for seismic effect may be justified. Reference is made to J P Tyson (1995).
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the head details of H-piles under compression and subject to bending moment?

For steel sections referred to in BS5950, universal bearing pile is characterized by having equal flange and web thickness while universal column has different flange and web thickness. Universal columns can also
be used as bearing piles.
In the design of the head details of H-piles, there are three typical cases to be considered, namely compression piles, tension piles and piles with bending moment at the head in addition to tension or compression. The design of these piles recommended by G. M. Cornfield (1968) is listed below:
(i) Compression piles
For this type of piles, H-piles should be embedded 150mm in concrete pile caps and it is not necessary to use any dowels and capping plates in their connection.
(ii) Tension piles
A number of hook-ended bars are welded to the top of H-piles.
(iii) Piles with bending moment at their head (tension or compression)
The depth of embedment of piles into pile caps is substantially increased and loads are transferred by horizontal bars welded to piles’ flanges.
Different arrangement of pile head details
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the functions of different reinforcement in a typical pile cap?

Loads from columns transferring to pile cap induce tensile forces at the bottom of the cap. For instance, by using truss analogy to analyze a pile cap sitting on two piles with a column at the centre of the pile cap, the
tensile force at the bottom is proportional to the pile spacing and is inversely proportional to depth of pile cap. The bottom reinforcement is designed to resist the tensile stressed generated from loads in columns.
Side reinforcement may not be necessary in pile cap (L.A. Clark (1983)). In fact, the primary aim of the side reinforcement is to control cracking. However, as most pile caps are hidden from view and it is considered not necessary to provide side reinforcement to pile caps based on aesthetic reason.
Sometimes, reinforcement may be designed at the top of pile caps which serve as compression reinforcement. This type of reinforcement is required in case there is a limitation on the depth of pile caps. Similarly shear reinforcement is introduced to the pile caps in case there is a restriction to the depth of pile caps.
L. A. Clark (1983) Concrete Bridge Design to BS5400 Construction Press, Longman Group Limited pp.94
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

How does the pile installation method affect the load carrying capacity of piles?

The construction of piles by driving method causes an increase in density of the surrounding soils. Hence, for loose soils this results in improved compaction of soils between the piles. The sum of the capacities of all piles
as a whole is generally greater than the sum of individual pile capacities provided that the effect of pile spacing is not taken into account. However, for bored piles the boring operation induces considerable stress relief and
this causes a substantial reduction in shear strength of soils.

Which of the following stages is noisier, at the ending of pile driving operation or at the end of pile driving operation?

When the piles are progressively driven into the ground, the pile section above the ground declines. As a result, the degree of damping on the piles increases. Moreover, the area of exposure of piling surface reduces, thereby reducing the area generating noise form piles. Hence towards the end of pile driving operation, the noise level shall be reduced accordingly.
Noise screen shall be installed to tackle the noise problem. Noise screen made of plywood might not be sufficient because it tends to reflect the noise back to the site and increase the reverberation of the site. Instead for the face of noise screen facing the piling operation shall be lined with a layer of sound-absorbing material such as glass fibre. Moreover, openings on noise screen should be avoided because it can substantially reduce the performance of noise screen.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

In designing the lateral resistance of piles, should engineers only use the earth pressure against pile caps only?

In some design lateral loads are assumed to be resisted by earth pressure exerted against the side of pile caps only. However, it is demonstrated that the soil resistance of pile lengths do contribute a substantial part of lateral resistance. Therefore, in designing lateral resistance of piles, earth pressure exerted on piles should also be taken into consideration.
In analysis of lateral resistance provided by soils, a series of soil springs are adopted with modulus of reaction kept constant or varying with depth. The normal practice of using a constant modulus of reaction for soils is
incorrect because it overestimates the maximum reaction force and underestimates the maximum bending moment. To obtain the profile of modulus of subgrade reaction, pressuremeter tests shall be conducted in
boreholes in site investigation. Reference is made to Bryan Leach (1980).
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Which one is a better choice, a large diameter piles or a system of several smaller piles with the same load capacity?

The choice of a large diameter pile suffers from the disadvantage that serious consequences would occur in case there is setting out error of the pile. Moreover, in terms of cost consideration, for the same load capacity the cost of a group of small diameter piles is generally lower than that of a large diameter pile. On the other hand, for small diameter piles i.e. mini-piles, they are advantageous in site locations with limited headroom and space. In addition, in some structures with only a few piles, it is uneconomic because of its high mobilization cost. Reference is made to Dr. Edmund C Hambly (1979).
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Do edge piles take up same loadings as central piles in rigid cap?

Due to the effect of interaction of individual piles, the central piles tend to settle more than the edge piles when the pile cap is under a uniform load. For the pile cap to be rigid, the local deformation of central piles would not occur. Instead, the stiff pile cap would transfer the loads from the central piles and redistribute them to the outer piles. Therefore, raking piles at the edge take up a higher fraction of the total loads and are subjected to higher axial and bending loads in case the pile cap is stiff. In the extreme case, the side piles may take up as much as about two to three times the loads in the central piles and this may lead to the failure of these raking edge piles.
There are several choices regarding the design to tackle the uneven distribution of loads. The first one involves the lengthening of side piles to stabilize the piles under high loads. However, the increased length of outer piles tends to attract more loads and this seems not to be a good solution. The other way out is to lengthen the central piles aiming at getting more loads and this evens out the load distribution among the piles
Stress bulb effect on load distribution in piles
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the differences between pinned bases and fixed bases?

When structures like portal frames are connected to the base foundation, engineers have to decide the degree of fixity for the connection. In general, the two common design options are pinned bases and fixed bases. Pinned bases have the advantage that the design of foundation is made simple so that some cost savings may result. However, fixed bases design provides additional rigidity and stiffening to the structures and the stability of the structures can be enhanced. Therefore, the use of fixed bases helps to improve the structural performance of the structures

How should the piles be arranged in a pile cap to reduce bending moment induced in piles?

Consider that piles are designed to intersect at a single common point in a pile cap. The resultant reactions would pass through the point of intersection in the pile cap. This type of arrangement does not involve any
bending moment induced if the horizontal loads pass through this point. However, in real life situation, the piling system is expected to resist a combination of vertical loads, horizontal loads and bending moment. To
counteract bending moment, the pile cap about the point of intersection is rotated so that significant amount of bending moment is induced in piles and pure axial forces in piles can hardly generate a counteracting moment based on one single intersection point.
However, if the piles are arranged in such a way that there are at least two separated points of intersection in the pile cap, the amount of flexural stresses induced in piles is significantly reduced.
Different arrangement of piles in pile cap
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

In some pile design, the settlement of piles are not checked. Is it correct?

The performance of piles mainly consists of the two elements, namely ultimate bearing capacity and settlement. The local practice of pile design is place emphasis on checking if the bearing capacity of piles would be exceeded.
Engineers tend to adopt the approach that bored piles are designed to be founded on bedrock while for driven piles they are driven to very stiff stratum with SPT N values greater than 200. Owing to rigid and firm
foundation on which the piles are seated, it is therefore assumed that the amount of settlement shall be limited. On the other hand, there is practical difficulty in assessing how much settlements are considered acceptable owing to limited available data.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Which type of pile cap transfers loads equally to piles, flexible pile cap or rigid pile cap?

Loads from columns transferring to pile cap induce tensile forces at the bottom of the cap. For instance, by using truss analogy to analyze a pile cap sitting on two piles with a column at the centre of the pile cap, the
tensile force at the bottom is proportional to the pile spacing and is inversely proportional to depth of pile cap. The bottom reinforcement is designed to resist the tensile stressed generated from loads in columns.
Sometimes, reinforcement may be designed at the top of pile caps which serve as compression reinforcement. This type of reinforcement is required in case there is a limitation on the depth of pile caps. Similarly shear reinforcement is introduced to the pile caps in case there is a restriction to the depth of pile caps. Consider that loads are applied at the centre of a pile cap.
For the case of rigid pile cap, owing to the effect of interaction of individual piles, the central piles tend to settle more than the edge piles when the pile cap is under loading condition. For the pile cap to be rigid, the local deformation of central piles would not occur. Instead, the stiff pile cap would transfer the loads from the central piles and redistribute them to the outer piles. Therefore, piles at the edge take up a higher fraction of the total loads and are subjected to higher axial and bending loads in case the pile cap is stiff. In the extreme case, the side piles may take up as much as about two to three times the loads in the central piles and this may lead to the failure of these edge piles.
For flexible pile cap, load taken up by individual piles are different because the deformation of pile cap enhances non-uniform distribution of loads among piles. The piles closer to the load tend to share more loads when compared with those which are located far away from the loads. The difference of loads induced in piles increase with the flexibility of pile cap.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

In modeling a nonrigid mat foundation by using elastic springs, should a uniform modulus of subgrade reaction be used along the whole base of mat?

By using a bed of springs to simulate the flexible behaviour of mat subject to loads, care should be taken in selection of the modulus of subgrade reaction. In fact, the modulus of subgrade reaction depends on many
factors like the width of the mat, the shape of the mat, the depth of founding level of the mat etc. In particular, the modulus of subgrade reaction is smaller at the center while it is larger near the mat’s edges. If a constant modulus of subgrade reaction is adopted throughout the width of the mat, then a more or less uniform settlement will result when subject to a uniform load. However, the actual behaviour is that settlement in the center is higher than that at side edges. Consequently, it leads to an underestimation of bending moment by 18% to 25% as suggested by Donald P. Coduto (1994).
In general, a constant value of modulus of subgrade reaction is normally applied for structure with a rigid superstructure and the rigid foundation. However, a variable modulus of subgrade reaction is adopted instead for non-rigid superstructure and non-dominance of foundation rigidity to account for the effect of pressure bulbs.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What is the purpose of setting maximum spacing of piles?

One of the factors that affect the distribution of loads from the structures to each pile is the assumption of flexibility of the pile caps in design. A pile cap can be modeled as a flexible or a rigid element based on their relative stiffness. For the pile cap to be assumed as rigid the stiffness of pile cap is infinite relative to that of pile/soil system and the deformations within the cap are not considered owing to its rigidity. On the other hand, for the pile cap to be designed as flexible, internal deformations of pile cap would occur.
In some design guidelines, maximum spacing of piles is specified to limit the length between adjacent piles so that the assumption of rigid pile cap can be justified.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What is the difference between capping beams and ground beams for piles?

Capping beams for piles aim at transferring loads from closely spaced columns or walls into a row of piles. On the other hand, ground beams are beams provided between adjacent pile caps and they perform as compression struts or ties in an attempt to prevent lateral displacement or buckling of piles under uneven distribution of loads on pile caps. Both of them have to be specially designed to cater for differential settlement of piles.
Capping beam performs the same functions as pile caps. However, ground beams are structural elements to connect adjacent pile caps to improve the stability of foundation.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the differences in function between rock anchors and rock sockets?

Rock anchors are used primarily for resisting uplift forces. On the contrary, rock sockets serve three main purposes:
(i) Rock socket friction and end bearing to resist vertical load.
(ii) Passive resistance of rock sockets contribute to resistance of lateral load.
(iii) Socket shaft friction is also used for resisting uplifting forces. But only 70% of this capacity should be used because of the effect of negative Poisson ratio.
Note: Rock anchors, which may consist of a high tensile bar or a stranded cable, are provided for tension piles when there are insufficient soil covers to develop the required uplifting resistance.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What are the limitations of Plate Load Test?

Plate load test is carried out to check the bearing capacity of foundation soils.
The limitations of plate load test are:
(i) It has limited depth of influence. It could only give the bearing capacity of soils with depth up to two times the diameter of plate.
(ii) It may not provide information on the potential for long term consolidation of foundation soils.
(iii) There is scale effect as the size of test plate is smaller than actual foundation.
(iv) To gain access to test position, excavation is carried out which causes significant ground disturbance. The change in ground stress leads to the change of soil properties which the test is planned to investigate.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

Can both Pile Drive Analyser PDA and Pile Integrity Test PIT be used for checking pile capacity?

Pile Drive Analyser is a high-strain dynamic test to determine the force and velocity response of a pile to an impact force applied axially by a driving hammer at the pile top. It is applicable to driven piles or small diameter bored piles. The operation measures the elastic deformation of a pile after a hammer blow and is mainly used to check the ultimate capacity of piles. However, it may also be adopted to detect damages in pile body and obtain the friction profile along the pile shaft.
Pile Integrity Test is a low-strain dynamic test which involves the use of a small vibrator or a light hammer. It is applicable to small diameter driven concrete piles and large diameter bored piles. It can be used to check the following properties:
(i) Quality of concrete (e.g. honeycombing)
(ii) Location and type of damages
(iii) Estimation of pile length
However, it is mainly used to check the integrity of piles only and it may be used to deduce the pile capacity.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What is the difference between point of virtual fixity and critical length of lateral loading for piles?

Some engineers may get confused about the difference between the two terms i.e. point of virtual fixity and critical length used for piles for resisting lateral loads. For critical length of lateral loading for piles, it refers to a certain depth from the ground level where the piles behave as if it were infinitely long. As such, beyond the critical length, the change in lateral response of piles with increase in pile length will be negligible.
Point of virtual fixity refers to a certain dept below ground surface where the piles are fixed without movement under loads. The depth to the point of fixity is useful in assessing the buckling loads of piles. It is obvious that the depth to the point of virtual fixity should be smaller than the critical length of piles.

What are the meanings of the mathematical terms in failure criteria pile load test?

Load tests are conducted to verify the design assumptions and parameters such as pile friction in soils and sock socket capacity. There are various failure criteria in current construction industry to determine ultimate load resistance of piles in pile load test. For instance in 90% criterion of Brinch Hansen, it is based on the laboratory measured stress-strain relations of soils and a point is identified in which soil fails. This essentially aims at looking for the ultimate bearing capacity and hence the ultimate loads. In fact, this is not intended originally for piles.
For some failure criteria, it does not target at finding out the ultimate pile capacity. Instead, it looks for the process for onset of soil yielding at the base of pile toe an allows for controlled displacement. For example, one of these criteria is reproduced as follows:
Criterion for maximum movement = (PL/AE + d/120 + 4) mm
where P is the load, L is pile length, A is the area of pile and d is pile diameter.
This failure criterion was developed based on small diameter driven piles. The term PL/AE refers to elastic shortening of piles. For end-bearing piles, this term is acceptable for usage. However, for friction piles this may not truly simulate the actual shortenings of piles because frictional forces along the pile also come into play. The term (d/120 + 4) represents the amount of soil movement which triggers the yielding of soil beneath pile toe.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

What is the purpose of conducting load test for piling works?

Pile load test provides information on ultimate bearing capacity but not settlement behavior. In essence, it can determine if the load is taken up by the stratum designed or if the centre of resistance is at the design location in piles as suggested by Robert D. Chellis (1961).
After conducting load tests, the curve of movement of pile head (Settlement against load) and the curve of plastic deformation can be plotted. By subtracting the curve of plastic deformation from the curve of pile head movement at each load, the curve of elastic deformation can be obtained. For piles of end-bearing type unrestrained by friction, the theoretical elastic deformation can be calculated from e=RL/AE where e is
elastic deformation, L is pile length, A is area of pile, E is Young’s Modulus of pile material and R is the reaction load on pile. By substituting e in the formula, the elastic deformation read from the curve of elastic deformation, L can be obtained which shows the location of the centre of resistance corresponding to that load.
Settlement load curve in pile load test
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

There is an old rule that the area of a follower should be one-fifth of precast concrete pile. Why?

The rules of wave mechanics suggested that to avoid reflection of stress wave caused by different impedance values, acoustic impedance should be the same for the follower and precast concrete piles. As such, it enhances smoothest driving and prevent follower from bouncing on the head of piles which is undesirable as it may damage the piles and lowers the efficiency of driving.
Acoustic impedance = Elastic Modulus (E) x Area of Pile / wave velocity
Wave velocity (c) = Elastic Modulus / Density of Pile

For normal steel, E=205GPa, c=5,100m/s
For normal concrete, E=30GPa, c=3,800m/s
For same acoustic impedance,
Area of concrete/Area of steel = (205/5,100)/(30/3,800) = 5
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

In the installation of strain gages in driven H-piles to measure loads, why should they be normally used in pairs?

Strain gages are often installed in driven piles to measure the load distribution along the piles. They have to be protected from being removed as the pile is driven into the ground. Protection of strain gages is achieved by welding channels or angles for enclosure of stain gages.
Strain gages should always be installed in pairs located back to back on the same piece of steel. For instance they may be placed back to back on either side of web of H-piles. Only one gage mounted on the cross section of H-pile is not too useful because it may be affected by an unknown degree by bending moment. Hence, the results of axial load may appear to be doubtful.
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.

How can piles be driven through steeply dipping karst surfaces?

The steep dipping and variable nature of karst surfaces poses problems for installation of driven piles. Very often, the consequences of hard driving piles over steeply-inclined karst are slipping and buckling of piles. To tackle these problems, the following two options are mostly adopted:
(i) Pre-boring is carried out in steep dipping karst surface as this method could penetrate hard layers;
(ii) Reinforcing the end section of driven piles by welding stiffening plates
This question is taken from book named – A Self Learning Manual – Mastering Different Fields of Civil Engineering Works (VC-Q-A-Method) by Vincent T. H. CHU.